Geotechnical monitoring

Track settlement, tilt and displacement during construction and in the surrounding area. Connect observation cycles to construction stages and an agreed notification procedure.

Geotechnical monitoring: explanatory engineering diagram
Conceptual illustration. Not to scale.

What you receive

A monitoring programme, baseline readings and reports showing changes over time.

Scope of work

Agree the programme, establish the observation network and baseline, repeat measurements at the specified stages and report trends using the agreed notification procedure.

What to send us

Design information, impact assessment where available, construction schedule, the assets and parameters to be observed, access and earlier monitoring records.

Choose the work you need

Monitoring of neighbouring buildings

Track the response of surrounding buildings while nearby work proceeds. Establish initial readings and link subsequent observations to the construction sequence.

Explore this service →

Excavation retaining wall monitoring

Track movements of the excavation support system as excavation and bracing advance. Select observation points and frequency for the design and construction stages.

Explore this service →

Automated geotechnical monitoring

Plan instrumented observation where frequent data collection is required. Define sensors, power, communications, data checks and notification responsibilities before installation.

Explore this service →

Crack width monitoring

Track change in identified cracks using repeatable measuring points. Record the baseline condition and interpret width changes together with other observations.

Explore this service →

Building tilt monitoring

Measure changes in building inclination relative to an agreed reference system. Separate overall tilt from local movements when defining the observation programme.

Explore this service →

Baseline geotechnical monitoring

Record initial conditions before construction produces the effects being monitored. Baseline readings must be traceable to the condition and construction stage at the time.

Explore this service →

Inclinometer monitoring

Measure lateral movement with depth using installed inclinometer systems. Installation quality, initial readings and consistent measurement procedures are essential.

Explore this service →

Geotechnical monitoring programmes

Define what to observe, how to measure it and who receives the results. Coordinate parameters, frequency and response criteria with the design and construction schedule.

Explore this service →

Monitoring forces in excavation struts

Track force changes in the agreed excavation bracing members. Interpret readings with the excavation stages, temperature effects and design assumptions.

Explore this service →

Settlement markers and benchmarks

Install stable survey references and observation markers before monitoring starts. Select positions that remain accessible and protected throughout the relevant work stages.

Explore this service →

Groundwater level monitoring

Track groundwater levels before and during construction or dewatering. Define observation boreholes, reference elevations and reading frequency in the programme.

Explore this service →

Slope monitoring

Observe movement and relevant groundwater changes on a slope. The monitoring scheme should address the potential mechanisms identified in the engineering assessment.

Explore this service →

Monitoring during reconstruction

Track the response of an existing building while loads and structural arrangements change. Connect observation cycles to the stages of reconstruction.

Explore this service →

Geotechnical monitoring reports

Consolidate measurements into a traceable account of change over time. Separate measured values, comparisons and conclusions, and identify missing or unreliable observations.

Explore this service →

Building settlement monitoring

Measure vertical displacement through repeated observations of the same markers. Protect reference benchmarks and use a consistent survey procedure across cycles.

Explore this service →

Budget and programme

From RUB 45,000 / cycle

Programme preparation, network installation, baseline and repeat cycles, number of points, methods, access and any automated equipment.

Guide prices and what they include

Schedule agreed for the scope

The proposal defines mobilisation, field or testing work, processing and the agreed deliverables. Access, source data and the required test or observation duration affect the programme.

Guide budgets are indicative. Final quantities, price, taxes and dates are confirmed in the project proposal.

Before you commission the work

Can a single measurement replace monitoring?

A single visit records conditions at one time. Monitoring needs comparable observations over time, normally referenced to a baseline established before the relevant construction effects.

What if the initial information is incomplete?

Send what you have and describe the decision you need to make. We will identify which missing inputs matter for this service before agreeing the scope.

YOUR PROJECT

Request a scope and quote

Send the site address, project stage and the decision you need to make. We will review the available information and clarify the required work.

+7 (495) 215-57-27
info@glavgt.ru

Moscow, 5 Yuzhnoportovaya Street, Building 2.

Office and company details

Send your enquiry

Your enquiry is saved securely on our server. We will reply using the contact details you provide. Drawings or reports can be sent by email after we contact you.

Or email us directly